Client: Bord na Móna RESOURCE Recovery Ltd.
The Company acted as the Main Contractor and PSCS .
All works are carried out within the boundaries of a fully operational waste transfer facility at Blakecross, Lusk, operated by AES.
Works included:
Remediation of contaminated ground and removal and disposal of underground diesel pipe.
Repair and remediate the existing surface water drainage system.
Construction of fire water retention wall.
Repair and remediation works to the existing yard area.