Client: Sherwood Homes
The Company acted as the main contractor and PSCS.
This site was located adjacent to a large-scale residential development and the Royal Canal in the Newtown area of Maynooth, Co. Kildare. Our Client acquired the site after the contaminated material had been imported. All materials were screened on-site to minimise the amount of material which had to be removed from the site.
Works included:
Site Security – Fencing
Site Investigation
Topographic Surveys – Pre - Excavation / Pre - Restoration / Post Restoration
Surface / Ground Water and Leachate Management Works
Bulk Excavation (35,000m3 excavated)
Soil testing and analysis
Screening of all materials
Hazardous Waste Excavation / Treatment and Removal From Site (64,000 tonnes excavated / treated / 430 tonnes removed from site)
Construction of waste segregation areas
Environmental Monitoring & Management (Water / Dust / Noise / Odours)
Site Restoration (63,570 tonnes)